December 1, 2004
Floor and Framing


Bob the Builder was in on the Friday after Thanksgiving,
and framed in the perimeter of the floor.







Here's the vapor barrier on the floor, and the pressure treated boards around the perimeter.




Each day, there's a little more floor.


 
  I think this was Sunday night.





Here comes Mr. Hoppel -- in the back door!



I talked with Bob today, and the plywood subfloor
should be installed next week, along with sheetrock!




Here's the rough placement of the cabinets, sketched out on the wall.





Bob framed the wall on Wednesday.
He's got plastic sheeting under the studs to try to keep the moisture out.




The blue tape shows where the recessed lights will be placed.



Back          Home          Next